How to order from LONGWELL

Most first orders go through the same eight steps. Everything below is the standard framework — quantities, terms and lead times are confirmed per project in the quotation.

  1. 1SelectFind models by duty point in the selector or by model number, compare on the curve and add them to your RFQ list — or send us the duty point and let our engineers select.
  2. 2Engineering checkWithin 1 business day you receive the duty-point check, the measured curve, price and lead time — plus alternatives if a different size or platform fits better.
  3. 3SamplesStock models ship in 1–3 days. Test them on your bench; sample fees are credited against the production order.
  4. 4Validation supportDatasheets, drawings, wiring diagrams and DoC per model; test reports, CAD and register maps after a short project check or NDA.
  5. 5Order & paymentProforma invoice; first orders on T/T 30 / 70. Quantities from about 30 pcs for validation, 50–200 pcs standard.
  6. 6Production & QC15–30 days; five QC checkpoints and a 100% inline performance test of every unit, logged to MES.
  7. 7ShippingFOB / CIF / DDP by sea from Ningbo or Shanghai; express and air on EXW / FCA / DAP. Packing list and labels to your standard.
  8. 8After-sales18-month warranty, batch data on request for 5 years, 8D closed-loop for any issue, annual technical review for framework customers.

Commercial terms, quality and documentation

Samples

Stock standard models ship in 1–3 days. Sample fee by size (roughly USD 150–800 per unit), 100% credited against your first production order; stock standard models often complimentary in limited quantity.

Minimum order

First order typically 50–200 pcs depending on size; for a new partnership the first order can be reduced to about 30 pcs to support your internal validation. Repeat orders 30–200 pcs rolling; smaller quantities are quoted from stock.

Payment

First-time customers: T/T 30% advance, 70% against bill-of-lading copy. Later terms by agreement.

Lead time

Production batches 15–30 days ex works; custom configurations 30–45 days; new custom platforms on a 90-day NPI plan.

Logistics

Sea freight from Ningbo / Shanghai on FOB, CIF or DDP terms; air freight and express EXW / FCA / DAP via DHL, FedEx or UPS. Export cartons on pallets, labels and packing list to your requirement.

Quality control

Five checkpoints: incoming inspection with 100% checks of magnets, bearings and PCBs; first-piece and SPC in process; 100% inline performance test of every fan (airflow, speed, current, voltage, vibration, noise, temperature rise) logged to MES; outgoing AQL 2.5 sampling with packaging and label check; third-party inspection supported.

Warranty & after-sales

18-month warranty. Batch test data is retained for 5 years and returned within 2 business days on request; 8D closed-loop handling of any field issue.

Documentation

Datasheet, dimensional drawing, P-Q curve and wiring diagram on every model page; Declaration of Conformity per model and destination; test reports and CAD models after a short project check; Modbus register maps after NDA.

Confidentiality & audit

NDA on request. Factory audit welcome at the Ningbo / Yuyao plant with bilingual reception: production lines, QA laboratory and R&D centre. Customer references are shared after NDA — we do not publish customer names.

What backs this up

Questions buyers ask before the first order

Can I buy one or two fans for testing?

Yes. Stock standard models ship as samples in 1–3 days; the sample fee is credited in full against your first production order.

What is the minimum order quantity?

Typically 50–200 pcs per model depending on size, reducible to about 30 pcs for a first validation order. Ask — quantities are negotiated per project.

What are the payment terms for a first order?

T/T 30% advance and 70% against the bill-of-lading copy. Frame agreements and other terms are agreed after the first orders.

How long is delivery?

Samples 1–3 days from stock; production batches 15–30 days ex works; sea freight 25–40 days to Europe and North America, express 3–6 days.

Is every fan tested before shipping?

Yes — 100% inline performance test (airflow, speed, current, voltage, vibration, noise, temperature rise) logged to MES, plus outgoing AQL 2.5 sampling. Batch data is available on request for 5 years.

What certifications and documents will I receive?

CE (EMC / LVD), ETL for the listed DC and EC lines, RoHS and REACH per product line; ISO 9001 / 14001 / 45001 management systems; a Declaration of Conformity for your model and destination on request. Scans are on the R&D and certifications page.

Can you replace an ebm-papst, Ziehl-Abegg or Nicotra fan in my unit?

In most cases yes: send the competitor model or the duty point and mounting dimensions and we return the matching LONGWELL model with curve and drawing. The LWBE3G560, for example, is dimensioned 1:1 to the common Ø560 mm EC plug-fan format.

Do you sign NDAs and can we audit the factory?

Yes to both. NDA on request; factory audits at the Ningbo / Yuyao plant are welcome, with a bilingual team and access to the production lines, QA laboratory and R&D centre.

What warranty applies?

18 months, with 8D closed-loop handling of any field issue and batch test data available throughout the warranty period.

How fast do you answer?

An engineer replies within 1 business day (Ningbo office hours, UTC+8) with the duty-point check, curve, price and lead time. For urgent matters use WhatsApp.

Start with the duty point

Airflow, static pressure, voltage, control mode and quantity — our engineers propose the best-fit model with curve, price and lead time within 1 business day.

Select by duty point   Request a quotation
Scroll to Top
RFQ list