• ImpellerØ108 mm4.3 in
  • Max airflow172 m³/h101 CFM
  • Max static pressure288 Pa1.16 in. wg
  • Voltage230 V
  • Speed2,300 rpm
  • Input power60 W

LWGA108S-02 AC Gas Burner Blower Ø108 mm

Ø108 mm | AC | Max airflow 172 m³/h | Max static pressure 288 Pa

SKU: LWGA108S-02 Category:
  • Direct from LONGWELL
  • OEM / ODM
  • Samples in 1–3 days
  • Production 15–30 days
  • 12-month warranty
  • CE · RoHS · ETL on request
All files for LWGA108S-023 files · direct download

CAD models (STEP / DWG) are released on request — see “Engineering files” below. Another format or a non-standard variant? Ask an engineer · download center

View RFQ →

Dimensional drawing LWGA108S-02

Dimensional drawingDimensions in mm. Confirm against the final approval drawing before machining cut-outs.
LWGA108S-02 Dimensional drawing

Files for LWGA108S-02: datasheet, catalogue and drawing PDFs are listed above ↑ · CAD (STEP / DWG) on request — ask an engineer.

Technical description LWGA108S-02

LWGA108S-02 is a LONGWELL AC Gas Burner Blower, impeller Ø108 mm, rated 230 V AC, maximum airflow 172 m³/h, maximum static pressure 288 Pa, input power 60 W.

Technical data

Model LWGA108S-02
Series LWGA108
Motor type AC
Rated voltage 230 V
Frequency 50 Hz
Current 0.48 A
Input power 60 W
Speed 2,300 rpm
Max. airflow 172 m³/h
Max. static pressure 288 Pa
Impeller diameter Ø108 mm

Nameplate values; final selection is confirmed at the duty point and by project verification.

Company certificates

Scans of original documents held by Ningbo Longwell Electric Technology Co., Ltd.: the company ISO 9001 / 14001 / 45001 management-system certificate. Click a scan to open the original.

ISO 9001 / 14001 / 45001Management systems of Ningbo Longwell Electric Technology Co., Ltd. (company certificate).

ISO 9001 / 14001 / 45001 management system certificate — LONGWELL certificatePDFISO 9001 / 14001 / 45001 management system certificate

Need a Declaration of Conformity for this model and your destination market? Ask us — we arrange additional certification on request.

How to order LWGA108S-02

Most first orders follow the same eight steps. Quantities, terms and lead times are confirmed in your quotation.

  1. 1SelectFind models by duty point in the selector or by model number, compare on the curve and add them to your RFQ list.
  2. 2Engineering checkWithin 1 business day you receive the duty-point check on the curve, price and lead time.
  3. 3SamplesStock models ship in 1–3 days.
  4. 4Validation supportDatasheets, drawings, wiring diagrams and DoC per model; test reports, CAD and register maps after a short project check or NDA.
  5. 5Order & paymentProforma invoice; first orders on T/T 30 / 70.
  6. 6Production & release15–30 days at the partner factory that builds your model, then inspected and released to LONGWELL standards with outgoing sampling to AQL 2.5.
  7. 7ShippingFOB / CIF / DDP by sea from Ningbo or Shanghai; express and air on EXW / FCA / DAP.
  8. 8After-sales12 months standard, extendable to 18–24 months by project agreement; test records retained for 5 years; 8D closed-loop for any issue; annual technical review for framework customers.

See terms, QC and FAQ →

Test & release at LONGWELL

Specified and drawn by LONGWELL; built to LONGWELL drawings by qualified partner factories; inspected and released to LONGWELL standards before shipment.

See test and release photos (8)
LONGWELL Semi-anechoic chamber
Semi-anechoic chamber
LONGWELL Semi-anechoic chamber
Semi-anechoic chamber
LONGWELL Test laboratory
Test laboratory
LONGWELL Test laboratory
Test laboratory
LONGWELL Burn-in test
Burn-in test
LONGWELL Burn-in test
Burn-in test
LONGWELL Inspection
Inspection
LONGWELL Warehouse
Warehouse

Test labs and all certificate scans →

Alternatives with the same impeller (Ø108 mm · AC)

Same impeller, different speed grade, power or wiring. Step up for more airflow, step down for lower noise.

ModelMax airflowMax static pressureSpeedPowerNoiseVoltage
LWGA108S-02 this model 172 m³/h288 Pa 2,300 rpm60 W—230 V
LWGA108S-15 94 m³/h272 Pa 1,400 rpm35 W—230 V View
LWGA108S-13 98 m³/h263 Pa 1,600 rpm37 W—230 V View
LWGA108S-09 98 m³/h273 Pa 1,300 rpm33 W—230 V View
LWGA108S-03 103 m³/h185 Pa 2,100 rpm43 W—230 V View
LWGA108S-14 107 m³/h288 Pa 1,350 rpm35 W—230 V View
LWGA108S-08 113 m³/h268 Pa 2,200 rpm35 W—220 V View
LWGA108S-06 113 m³/h268 Pa 2,000 rpm35 W—220 V View
LWGA108S-07 131 m³/h263 Pa 2,000 rpm47 W—220 V View
LWGA108S-10 132 m³/h328 Pa 2,450 rpm53 W—230 V View
LWGA108S-01 139 m³/h309 Pa 2,000 rpm47 W—220 V View
LWGA108S-11 144 m³/h283 Pa 2,100 rpm55 W—230 V View
LWGA108S-04 148 m³/h304 Pa 2,250 rpm53 W—230 V View
LWGA108S-05 160 m³/h314 Pa 2,500 rpm65 W—230 V View

Not sure which one? Send us the duty point (airflow / static pressure / noise limit) — use the selector or ask an engineer.

Go deeper on longwellfans.com

Application guides, project stories and engineering calculators for gas blowers — on our main site.

Ningbo Longwell Electric Technology Co., Ltd. · No. 100 Henan Road, Ditang, Yuyao, Ningbo, Chinasales@longwellfans.com · WhatsApp +86 183 5827 4663 · Mon–Fri 8:30–17:30 (UTC+8), reply within 1 business dayHow to order · Privacy notice
Scroll to Top
WhatsApp Email sales
Get a quote