- Max airflow30,600 m³/h18,011 CFM
- Voltage220 V
- Speed1,950 rpm
- Input power18 W
LWGA18S-01 AC Gas Burner Blower
AC | Max airflow 30,600 m³/h
- Direct from LONGWELL
- OEM / ODM
- Samples in 1–3 days
- Production 15–30 days
- 12-month warranty
- CE · RoHS · ETL on request
CAD models (STEP / DWG) are released on request — see “Engineering files” below. Another format or a non-standard variant? Ask an engineer · download center
Dimensional drawing LWGA18S-01

Files for LWGA18S-01: datasheet, catalogue and drawing PDFs are listed above ↑ · CAD (STEP / DWG) on request — ask an engineer.
Technical description LWGA18S-01
LWGA18S-01 is a LONGWELL AC Gas Burner Blower, rated 220 V AC, maximum airflow 30,600 m³/h, input power 18 W.
Technical data
| Model | LWGA18S-01 |
|---|---|
| Series | LWGA18 |
| Motor type | AC |
| Rated voltage | 220 V |
| Frequency | 50 Hz |
| Current | 147 A |
| Input power | 18 W |
| Speed | 1,950 rpm |
| Max. airflow | 30,600 m³/h |
Nameplate values; final selection is confirmed at the duty point and by project verification.
Company certificates
Scans of original documents held by Ningbo Longwell Electric Technology Co., Ltd.: the company ISO 9001 / 14001 / 45001 management-system certificate. Click a scan to open the original.
ISO 9001 / 14001 / 45001Management systems of Ningbo Longwell Electric Technology Co., Ltd. (company certificate).
PDFISO 9001 / 14001 / 45001 management system certificateNeed a Declaration of Conformity for this model and your destination market? Ask us — we arrange additional certification on request.
How to order LWGA18S-01
Most first orders follow the same eight steps. Quantities, terms and lead times are confirmed in your quotation.
- 1SelectFind models by duty point in the selector or by model number, compare on the curve and add them to your RFQ list.
- 2Engineering checkWithin 1 business day you receive the duty-point check on the curve, price and lead time.
- 3SamplesStock models ship in 1–3 days.
- 4Validation supportDatasheets, drawings, wiring diagrams and DoC per model; test reports, CAD and register maps after a short project check or NDA.
- 5Order & paymentProforma invoice; first orders on T/T 30 / 70.
- 6Production & release15–30 days at the partner factory that builds your model, then inspected and released to LONGWELL standards with outgoing sampling to AQL 2.5.
- 7ShippingFOB / CIF / DDP by sea from Ningbo or Shanghai; express and air on EXW / FCA / DAP.
- 8After-sales12 months standard, extendable to 18–24 months by project agreement; test records retained for 5 years; 8D closed-loop for any issue; annual technical review for framework customers.
Test & release at LONGWELL
Specified and drawn by LONGWELL; built to LONGWELL drawings by qualified partner factories; inspected and released to LONGWELL standards before shipment.
See test and release photos (8)








Alternatives at a similar dutySimilar airflow, different construction or motor platform
LWAA6D900S-5MKB-01Ø900 mm · 31,106 m³/h · ACsimilar duty
LWAE3G800TS-4PKW-04Ø800 mm · 29,400 m³/h · 306 Pa · ECsimilar duty
LWAE3G900TS-5PKW-02Ø900 mm · 32,192 m³/h · 244 Pa · ECsimilar duty
LWAE3G900TS-5MGW-01Ø900 mm · 32,313 m³/h · 365 Pa · ECsimilar duty
LWGA17S-0128,800 m³/h · ACsimilar duty
LWGA20S-01Ø20 mm · 28,800 m³/h · ACsimilar dutySee all Gas Blowers · select by duty point
Go deeper on longwellfans.com
Application guides, project stories and engineering calculators for gas blowers — on our main site.
