• ImpellerØ148 mm5.8 in
  • Max airflow196 m³/h115 CFM
  • Max static pressure3,090 Pa12.41 in. wg
  • Voltage230 V
  • Speed8,400 rpm
  • Input power130 W

LWGE148S-05 EC Gas Burner Blower Ø148 mm

Ø148 mm | EC | Max airflow 196 m³/h | Max static pressure 3,090 Pa

SKU: LWGE148S-05 Category:
  • Direct from LONGWELL
  • OEM / ODM
  • Samples in 1–3 days
  • Production 15–30 days
  • 12-month warranty
  • CE · RoHS · ETL on request
All files for LWGE148S-053 files · direct download

CAD models (STEP / DWG) are released on request — see “Engineering files” below. Another format or a non-standard variant? Ask an engineer · download center

View RFQ →

Dimensional drawing LWGE148S-05

Dimensional drawingDimensions in mm. Confirm against the final approval drawing before machining cut-outs.
LWGE148S-05 Dimensional drawing

Files for LWGE148S-05: datasheet, catalogue and drawing PDFs are listed above ↑ · CAD (STEP / DWG) on request — ask an engineer.

Technical description LWGE148S-05

LWGE148S-05 is a LONGWELL EC Gas Burner Blower, impeller Ø148 mm, rated 230 V EC, maximum airflow 196 m³/h, maximum static pressure 3,090 Pa, input power 130 W.

Technical data

Model LWGE148S-05
Series LWGE148
Motor type EC
Rated voltage 230 V
Frequency 50 Hz
Current 0.9 A
Input power 130 W
Speed 8,400 rpm
Max. airflow 196 m³/h
Max. static pressure 3,090 Pa
Impeller diameter Ø148 mm

Nameplate values; final selection is confirmed at the duty point and by project verification.

Company certificates

Scans of original documents held by Ningbo Longwell Electric Technology Co., Ltd.: the company ISO 9001 / 14001 / 45001 management-system certificate. Click a scan to open the original.

ISO 9001 / 14001 / 45001Management systems of Ningbo Longwell Electric Technology Co., Ltd. (company certificate).

ISO 9001 / 14001 / 45001 management system certificate — LONGWELL certificatePDFISO 9001 / 14001 / 45001 management system certificate

Need a Declaration of Conformity for this model and your destination market? Ask us — we arrange additional certification on request.

How to order LWGE148S-05

Most first orders follow the same eight steps. Quantities, terms and lead times are confirmed in your quotation.

  1. 1SelectFind models by duty point in the selector or by model number, compare on the curve and add them to your RFQ list.
  2. 2Engineering checkWithin 1 business day you receive the duty-point check on the curve, price and lead time.
  3. 3SamplesStock models ship in 1–3 days.
  4. 4Validation supportDatasheets, drawings, wiring diagrams and DoC per model; test reports, CAD and register maps after a short project check or NDA.
  5. 5Order & paymentProforma invoice; first orders on T/T 30 / 70.
  6. 6Production & release15–30 days at the partner factory that builds your model, then inspected and released to LONGWELL standards with outgoing sampling to AQL 2.5.
  7. 7ShippingFOB / CIF / DDP by sea from Ningbo or Shanghai; express and air on EXW / FCA / DAP.
  8. 8After-sales12 months standard, extendable to 18–24 months by project agreement; test records retained for 5 years; 8D closed-loop for any issue; annual technical review for framework customers.

See terms, QC and FAQ →

Test & release at LONGWELL

Specified and drawn by LONGWELL; built to LONGWELL drawings by qualified partner factories; inspected and released to LONGWELL standards before shipment.

See test and release photos (8)
LONGWELL Semi-anechoic chamber
Semi-anechoic chamber
LONGWELL Semi-anechoic chamber
Semi-anechoic chamber
LONGWELL Test laboratory
Test laboratory
LONGWELL Test laboratory
Test laboratory
LONGWELL Burn-in test
Burn-in test
LONGWELL Burn-in test
Burn-in test
LONGWELL Inspection
Inspection
LONGWELL Warehouse
Warehouse

Test labs and all certificate scans →

Alternatives with the same impeller (Ø148 mm · EC)

Same impeller, different speed grade, power or wiring. Step up for more airflow, step down for lower noise.

ModelMax airflowMax static pressureSpeedPowerNoiseVoltage
LWGE148S-05 this model 196 m³/h3,090 Pa 8,400 rpm130 W—230 V
LWGE148S-06 196 m³/h3,090 Pa 8,400 rpm130 W—230 V View

Not sure which one? Send us the duty point (airflow / static pressure / noise limit) — use the selector or ask an engineer.

Go deeper on longwellfans.com

Application guides, project stories and engineering calculators for gas blowers — on our main site.

Ningbo Longwell Electric Technology Co., Ltd. · No. 100 Henan Road, Ditang, Yuyao, Ningbo, Chinasales@longwellfans.com · WhatsApp +86 183 5827 4663 · Mon–Fri 8:30–17:30 (UTC+8), reply within 1 business dayHow to order · Privacy notice
Scroll to Top
WhatsApp Email sales
Get a quote